Stage 1 of 7, building records
Survey
Specify the work before you measure it.
Most evaluation failures start before any agent runs: the test measures something adjacent to the job. Survey is where your team writes down what the job actually is, precisely enough to test, including the parts experts do without being able to say how.
What happens
Your experts walk real cases through end to end, and Proving Ground breaks each into stations: what is read, what is decided, what is written, what is sent. At each station it records the acceptance criteria in the words of the person who would sign off, and the cost of getting it wrong, because errors are not equally expensive.
Survey pays particular attention to the long tail. Operational work is usually dominated by a few common case types and a long tail of rare ones, and the rare ones produce a disproportionate share of failures. A specification built from the common cases will pass agents that fail exactly where it matters.
What it does for trust
A standard has to belong to the people who rely on it. Public benchmarks are written by someone else, for someone else's distribution, and many saturate within a few years of release. The survey moves the definition of correct to the people who do the work, in a form they can read, dispute and amend. That is what makes every later number legible to them.
What it does for calibration
Construct validity comes first. If the specification diverges from the real job, every downstream measurement is precisely wrong, and the precision makes it more convincing, not less. The survey is where you decide what the instruments should measure, and record what they won't.
Specification is the hard part.
Agents optimize against what is written down, not against what was meant. Reinforcement learning has a long record of specification gaming, systems that maximize the stated objective in ways their designers never intended, and evaluators have recently documented coding agents rewriting tests so that they pass. A loose specification is an invitation.
The difficulty is that much expertise is tacit: people can do the job far more reliably than they can describe it. So Survey elicits criteria from disagreement. It shows your experts paired cases, asks which outcome is acceptable and why, and turns the reasons into checks. It is slower than writing a rubric at a desk, and far more accurate.
What it leaves behind
- A station-by-station specification of the work
- Acceptance criteria and error costs, in the experts' own words
- A map of the long tail: which cases are rare, and which are dangerous